Ling, S., and C. X. Guang. “The Two-Machine Flow-Shop Scheduling Problem With a Single Server and Unit Server Times”.
Journal of Informatics and Mathematical Sciences
, vol. 4, no. 1, Apr. 2012, pp. 123-7, doi:10.26713/jims.v4i1.74.