Construction of Project Management Using Information System

Authors

  • Khaled Mofawiz Alfawaz Department of Management Information System, Faculty of Economics and Administration, King Abdulaziz University, Jeddah, Saudi Arabia https://orcid.org/0000-0003-1699-222X
  • Fahd Mohammed Aljedani Department of Management Information System, Faculty of Economics and Administration, King Abdulaziz University, Jeddah, Saudi Arabia https://orcid.org/0000-0001-7105-6413

DOI:

https://doi.org/10.26713/cma.v13i2.2036

Keywords:

Project management, Cost maintenance, Research strategy, Organizational competency

Abstract

Information is playing a vital role of every concerns project management processes. The activities of organization’s project management, desires to attain an excellent flow of information. This task can be done through to build a high quality information system to that concern. This paper concentrates the present status of information systems in the function of construction project management for the huge corporation and government agencies in Saudi Arabia. The innovative conceptual model names as Information System Success (ISS) is built to obtain the barriers of information system in project constructions as well as independent variables are introduced. With the assistance of ISS model, the researcher can create a survey to verify the achievement of the information system and the autonomous variables that influence the information system within the population data. The results will explain the improvements of Saudi Arabia’s large corporation government agencies construction project. Moreover, the result indicates that the independent variables have focusing the effect of the information system such as IT infrastructure, organizational competence along with management support.

Downloads

Download data is not yet available.

References

A.A. Aziz, Z.M. Yusof, U.A. Mokhtar and Jamba, The determinant factors of Electronic Document and Records Management System (EDRMS) adoption in public Sector: a UTAUT-based conceptual model, in: 2017 6th International Conference on Electrical Engineering and Informatics (ICEEI), Langkawi: IEEE, pp. 1 – 6, (2017).

J.A. Alsuliman, Causes of delay in Saudi public construction, Alexandria Engineering Journal 58 (2) (2019), 801 – 808, DOI: 10.1016/j.aej.2019.07.002.

Build Force Canada, Engineering Construction, 03-14, (2021), https://www.careersinconstruction.ca/en/construction-industry/types-of-construction/engineering-construction.

P.Y. Chin, N. Evans, C.Z. Liu and K.K. Choo, Understanding factors influencing employees’ consumptive and contributive use of enterprise social networks, Information Systems Frontiers 22(6) (2020), 1357 – 1376, DOI: 10.1007/s10796-019-09939-5.

IGLOO, Digital Transformation, 03-14, (2021), https://customercare.igloosoftware.com/playbook/prep/digital_transformation.

K.C. Laudon and J.P. Laudon, Management Information Systems: Managing the Digital Firm, Pearson Education Limited, New York, USA (2014), URL: https://repository.dinus.ac.id/docs/ajar/Kenneth_C.Laudon,Jane_P_.Laudon_-_Management_Information_Sysrem_13th_Edition_.pdf.

K. Morford, Implementing Digital Transformation through the Project Management Office, Doctoral dissertation, The College of St. Scholastica, Duluth (2020).

Downloads

Published

17-08-2022
CITATION

How to Cite

Alfawaz, K. M., & Aljedani, F. M. (2022). Construction of Project Management Using Information System. Communications in Mathematics and Applications, 13(2), 823–833. https://doi.org/10.26713/cma.v13i2.2036

Issue

Section

Review Article